I've been thinking about this project for years and am so excited it finally happened. We decided in may that this would be the year we would remodel the kitchen. I've done a lot of research and designing to prepare and it started with ordering cabinets in June. Here is the before picture.
Preliminary demo started in July. We removed the cabinets above the fridge and next to the sink. This allowed us to fit in the new fridge and begin wall repair ahead of cabinet install.
Appliances arrived August 1st. The fridge and range went in right away.
We had and electrician add an outlet next to the existing light switch. This will give us power above a new countertop.
The drywall took a beating while removing the old tile backsplash, but I did a decent job fixing it. This section will be mostly hidden behind the fridge so I wasn't gonna work too hard on it.

The real action started August 21st. By this point I had done most of the demo and set up the temporary kitchen.

We kept this section of cabinets in so we would have use of the sink for a few more days.

Our cabinets came from on online vendor. We chose a ready to assemble style and my dad came over to help with the bulk of the work. There was a bit of a learning curve, but we settled in and made great progress. We worked all day Friday and Saturday morning before taking a break until Monday to allow for other scheduled activities. We were able to install most of the range wall and have the peninsula cabinets assembled.
The rest of the cabinets came out Monday and we had the fridge wall fully installed by end of day Monday. Jimmy was so excited to get the water hooked up to the fridge. Finally a functional ice maker after buying ice for years.
Tuesday was some finishing touches. Microwave installation and adding the back panel to the peninsula.
My dad punched out by lunch time Tuesday and it was up to me to finish the rest except for the sink install once the countertops arrive.
We were able to move out temporary set up back to the kitchen and used the bathroom sink for a couple weeks. We were able to quickly schedule the countertop measuring for Thursday of the same week.
I took a picture of the first ice for Jimmy. The ice maker noise took some getting used to.
There are several accessories that will make our cabinets more useful as well. Pull out spice racks and pantry shelves. These are game changers!
I spent the time in between putting up window trim and baseboards. This was the last room to get oak trim. We held off when doing the rest of the house so we wouldn't have to redo it when the kitchen was done. The countertops were installed September 8th and my dad came over a couple days later to install the faucet and dishwasher.
There are still some details to finish, but we have a fully functional kitchen. I am sure there will be a bunch of things we adjust as we learn to work in the new space. I am really proud of the work we did in such a short time.